Montara Platform

 
2192
nominal launch weight
No
Yes
Yes
Yes
No
Office: Perth 
Customer: Coogee Resources 
Location: North West Shelf, Australia  
Timeframe: Jan  2007-  Jun 2008  
The Montara Platform is situated in the Timor Sea in a water depth of 80m. Weak soils and a marine environment subjected to cyclonic storms provided significant challenges to the design team.

 The innovative jacket design consisted of a four legged launch tower structure removing the need for heavy lift vessel for installation which delivered cost and schedule savings to the customer.  The jacket design also overcame the challenging foundation requirements of a maximum of 25m pile penetration. 

The design solution required substantial analysis to optimise the pile configuration to maintain an even distribution of pile head load and resulted in a total of nine piles in an optimised configuration at the base of the substructure.  The nominal launch weight was 2192 tonnes and the structure was launched base first. 