This page is printed from WorleyParsons.com

Jackfish 2

 
1900
metric tons of steel erected
No
No
No
Yes
No
Office: Edmonton 
Customer: Devon Canada Corporation 
Location: WorleyParsonsCord Blackfalds Module Yard 
Timeframe: 2009 
WorleyParsonsCord Ltd. was contracted to fabricate and assemble components for seventy two modules for the Devon Jackfish SAGD facility.

 

 

WorleyParsonsCord’s scope of services was:

  • Procurement of pipe and fittings less than 8”
  • Receive and control all inventory order by the client including pipe and fittings over 8” and all equipment
  • Expediting all material to mod yard
  • Erect approximately 1900 metric tons of steel
  • Pipe fabrication estimated at 160,000 Factored Diameters Inches of welding (FDI).
  • Load 39 pipe modules and 33 equipment modules with approximately 5000 spools
  • Hydro testing of all mod piping and ship loose spools
  • Manage all sub-contractor work including:
    • Electrical - metal buildings
    • Insulation - painting
    • P.W.H.T  - glycol tracing
    • Metal buildings
    • Painting
    • Glycol tracing
  •  Prepare for shipping by securing all pipes, components, equipment, instruments and electrical. Responsible for providing temporary supports for safe transportation