The existing pipeline network has reached its intended design life, putting a strain on increasing planned production.
WorleyParsons was responsible for the conceptual design and detailed engineering of the project to re-establish a reliable offshore pipeline network to maximize BSP’s short and long term production. The integrity of all aged pipelines was to be restored by 2007/8 and a maintenance reference plan implemented.