Cliff Head Development

 
18
meter water depth
No
Yes
Yes
Yes
No
Office: Perth 
Customer: ROC Oil 
Location: North West Shelf Australia 
Timeframe: 2003 - present 
The offshore portion of the Cliff Head Development includes six production wells and two re-injection wells located on an unstaffed offshore platform on a four-leg jacket in 18 m water depth.
The Cliff Head reservoir has a waxy, high pour point crude oil and very low gas-to-oil ratio which, along with the requirement to cater for the water injection requirements, presented unique design challenges. This was also a fast track project with first oil targeted 14 months from start of detailed design and procurement. WorleyParsons’ design overcame the unique challenges associated with this particular waxy crude.